Double Vanity Project — Removal, Replacement & Trim
A two-vanity bathroom project in Algonquin. One vanity was fully removed and replaced; on the second, the vanity came out and the missing laminate flooring underneath was filled in before finishing.
The Work
- Removed two existing vanities; one replaced with a new unit, the other reworked
- Patched the missing laminate flooring where the second vanity had been
- Filled and repaired all holes left in the walls
- Cut precise openings for the plumbing connections
- Caulked, cut, and installed all trim around the new work
The Result
A clean, finished bathroom — new vanity set, flooring made whole, walls patched, and every trim piece cut and sealed for a tidy, professional look.
Need Finish Carpentry & Accent Walls in your area?
EasyFix handles jobs like this across Arlington Heights and the northwest Chicago suburbs. Text a photo for a flat-rate quote — usually within 2 hours.
View Finish Carpentry & Accent Walls Details →